Temporary Works

Indesco has been involved in temporary design of several elements of construction, from formwork back propping, to concrete pump climbing. Analysis is conducted with drawings the produced showing all the requirements of the temporary works which are then inspected.


Determine suitable arrangement of back props to ensure acceptable deflection of wet deck being poured and forces in each steel prop within working limits. Determining the forces transferred into the supporting steel frames from the rams that were used to climb the concrete pump. Specify bracing requirements for the steel frames to ensure stability during loading and unloading cycles.

Location:
Canberra, ACT